System for managing scheduling conflicts
US8391459B2 · kind B2 · utility
10Cited by
0References
16Claims
0Family size
Assignee
Inventors
Key dates
| Filing date | Jul 20, 2007 |
| Grant date | Mar 5, 2013 |
| Priority date | — |
| Expiry date | May 4, 2031 |
Classification
- Technology area (CPC H)Electricity
- CPC primaryH04M2203/2072
- WIPO fieldTelecommunications
- WIPO sectorElectrical engineering
Abstract
A system that incorporates teachings of the present disclosure may include, for example, a proactive scheduler having a controller element to determine a scheduling conflict between a called party and a calling party according to calendar information of the called party and presence information of the called party. Additional embodiments are disclosed.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.