Patent · US Active

Method for evaluating an underground reservoir production scheme taking account of uncertainties

US8392164B2 · kind B2 · utility

1Cited by
16References
16Claims
0Family size

Assignee

Inventors

Key dates

Filing dateAug 4, 2008
Grant dateMar 5, 2013
Priority date
Expiry dateJul 11, 2031

Classification

  • Technology area (CPC E)Fixed Constructions
  • CPC primaryE21B43/00
  • WIPO fieldCivil engineering
  • WIPO sectorOther fields

Abstract

A method for evaluating an underground reservoir production scheme accounting for uncertainties is disclosed having applications, for example, to the development of petroleum reservoirs. Flow simulator input parameters characterizing the reservoir and the production scheme are selected. An approximate analytical model allowing the reservoir responses to be predicted is constructed. A desired degree of accuracy Dp is defined, this degree of accuracy Dp measuring the difference between the responses of the model and those of the simulator. The degree of accuracy Dp(M) of the predictions of the model is calculated. Simulations are selected which are performed, pertinent for adjustment of the model. The simulations are carried out for each response simulated by the simulator and the analytical model is adjusted by means of an approximation method. This operation is repeated until the desired degree of accuracy Dp is reached and the production scheme is evaluated by analyzing the reservoir responses predicted by the approximate analytical model.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.