Patent · US Expired

Method and system for integrated reservoir and surface facility networks simulations

US8401832B2 · kind B2 · utility

18Cited by
6References
19Claims
0Family size

Assignee

Inventors

Key dates

Filing dateNov 23, 2002
Grant dateMar 19, 2013
Priority date
Expiry dateApr 19, 2023

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06F2119/08
  • WIPO fieldComputer technology
  • WIPO sectorElectrical engineering

Abstract

A method includes initiating a first reservoir simulation on a first simulator for a first set of physical parameters of a first reservoir. The first reservoir simulator uses a first set of components for a compositional reservoir model. A second reservoir simulation is initiated on a second simulator. A network simulation is initiated on a network simulator to model a network for coupling the first reservoir and the second reservoir to a surface facility. The network simulator uses a second set of components for a compositional network model. The method further includes translating each of a first hydrocarbon fluid stream of the first reservoir simulator and a second hydrocarbon fluid stream of the second reservoir simulator to a common fluid model. Further, network balancing is initiated among the simulators at a corresponding point in each controller time step.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.