Collaboration based capacity planning in a modular business setting
US8417555B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | May 18, 2010 |
| Grant date | Apr 9, 2013 |
| Priority date | — |
| Expiry date | Mar 22, 2031 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06Q10/06312
- WIPO fieldIT methods for management
- WIPO sectorElectrical engineering
Abstract
A computer implemented method, system, and/or computer program product collaboratively reallocate resources across business modules. A collaboration vector, which describes primary and second abilities for each of multiple resources, is defined. A decision matrix is created from multiple collaboration vectors, and a pipeline for transferring the multiple resources among multiple business modules is defined based on the decision matrix. A recurring time interval to measure an effectiveness of the multiple business modules is defined, and the multiple resources are reallocated according to a measured effectiveness of the multiple business modules. The collaborative matrix is optimized to reflect reallocation of the multiple resources.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.