Enablement and acceleration of live and near-live migration of virtual machines and their associated storage across networks
US8429651B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Jan 20, 2010 |
| Grant date | Apr 23, 2013 |
| Priority date | — |
| Expiry date | Jun 29, 2031 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06F2009/4557
- WIPO fieldComputer technology
- WIPO sectorElectrical engineering
Abstract
A virtual machine is migrated between a source cloud and a destination cloud. A temporary storage is mounted to a partition management firmware of the source cloud and to a partition management firmware of the destination cloud. A first storage location migration migrates the virtual machine from the source cloud to the at least one temporary storage. A second storage location migration migrates the virtual machine from the at least one temporary storage to final destination storage of the destination cloud. The temporary storage is then unmounted from the partition management firmware of the source cloud and from the partition management firmware of the destination cloud.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.