Patent · US Active

Method and system for pore pressure prediction

US8447579B2 · kind B2 · utility

1Cited by
0References
35Claims
0Family size

Assignee

Inventors

Key dates

Filing dateJul 5, 2011
Grant dateMay 21, 2013
Priority date
Expiry dateJul 5, 2031

Classification

  • Technology area (CPC E)Fixed Constructions
  • CPC primaryE21B49/00
  • WIPO fieldCivil engineering
  • WIPO sectorOther fields

Abstract

A method for performing an oilfield operation at a wellsite having a drilling rig configured to advance a drilling tool into a subsurface formation. The method includes generating a borehole temperature model for an area of interest using water depth information and a vertical stress model, generating a formation temperature model using the borehole temperature model, generating a mud-weight pressure model using the formation temperature model and pressure coefficients, generating a formation pore pressure model using the mud-weight pressure model, and adjusting the oilfield operation based on the formation pore pressure model.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.