Patent · US Active

Methods and systems for assigning non-continual jobs to candidate processing nodes in a stream-oriented computer system

US8458720B2 · kind B2 · utility

5Cited by
6References
18Claims
0Family size

Assignee

Inventors

Key dates

Filing dateAug 17, 2007
Grant dateJun 4, 2013
Priority date
Expiry dateJan 17, 2031

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06F2209/5021
  • WIPO fieldComputer technology
  • WIPO sectorElectrical engineering

Abstract

A system and method for choosing non-continual jobs to run in a stream-based distributed computer system includes determining a total amount of resources to be consumed by non-continual jobs. A priority threshold is determined above which jobs will be accepted, below which jobs will be rejected. Overall penalties are minimized relative to the priority threshold based on estimated completion times of the jobs. System constraints are applied to ensure that jobs meet set criteria such that a plurality of non-continual jobs are scheduled which consider the system constraints and minimize overall penalties using available resources.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.