Dynamic scheduling of jobs/batches using earliest completion time algorithm in cellular manufacturing with batch-splitting of jobs above certain size
US8464268B2 · kind B2 · utility
Assignees
Inventors
Key dates
| Filing date | Sep 14, 2009 |
| Grant date | Jun 11, 2013 |
| Priority date | — |
| Expiry date | Oct 3, 2031 |
Classification
- Technology area (CPC Y)Emerging Cross-Sectional Technologies
- CPC primaryY02P90/02
- WIPO fieldControl
- WIPO sectorInstruments
Abstract
The present application a new and improved system and method of enhanced Lean Document Production (LDP), which applies cellular manufacturing to document printing operations. The LDP process incorporates process friendly cells and, a push model to order to improve efficiency, reduce work in progress and smooth out the “frictions” in production environments. The current application presents an earliest-completion-time strategy for assigning jobs to cells and a dynamic-priority-based-batch-scheduling algorithm.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.