Patent · US Active

Method for reducing risk associated with a task

US8478627B2 · kind B2 · utility

1Cited by
6References
16Claims
0Family size

Assignee

Inventors

Key dates

Filing dateFeb 28, 2008
Grant dateJul 2, 2013
Priority date
Expiry dateAug 11, 2030

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY02W90/00
  • WIPO fieldIT methods for management
  • WIPO sectorElectrical engineering

Abstract

A method and system of reducing risk in the life cycle of a product, in one aspect, obtain one or more tasks required to achieve an overall task, determine risk impact of each task, the risk impact being an impact of each task on the likelihood of failure for the overall task and compute risk of overall task based on risk impacts of the tasks. The method and system utilize said risk impact of each task to schedule the tasks in such a way so as to reduce said risk of overall task as rapidly as possible.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.