Laying and protecting cable into existing covering surfaces
US8480332B2 · kind B2 · utility
Assignee
Inventor
Key dates
| Filing date | Sep 23, 2010 |
| Grant date | Jul 9, 2013 |
| Priority date | — |
| Expiry date | Feb 16, 2031 |
Classification
- Technology area (CPC H)Electricity
- CPC primaryH02G1/06
- WIPO fieldCivil engineering
- WIPO sectorOther fields
Abstract
To construct an underground cable line in-situ, cut and immediately evacuate a void in the existing covering surface. Next, lay or apply cable(s) into the void. Then, flow a non-shrinking composition into a portion of the void around the cable to fill a portion of the void. Upon rigidification the cable is encased in the void by the non-shrinking composition. Last, apply a topping material to the exposed surface of the composition in such volume as to fill any remaining portion of the void.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.