Patent · US Active

Packer deployment with electric submersible pump with optional retention of the packer after pump removal

US8528632B2 · kind B2 · utility

11Cited by
7References
20Claims
0Family size

Assignee

Inventors

Key dates

Filing dateSep 16, 2010
Grant dateSep 10, 2013
Priority date
Expiry dateAug 26, 2031

Classification

  • Technology area (CPC E)Fixed Constructions
  • CPC primaryE21B33/12
  • WIPO fieldCivil engineering
  • WIPO sectorOther fields

Abstract

An electric submersible pump ESP is run in to a desired subterranean location with a packer attached. Once at the desired location the packer is set either using the ESP or some other source of force or pressure. After the ESP has completed the task and needs to be removed, the packer stays set and the ESP releases from it. Removal of the ESP assembly allows a valve in the packer mandrel to close to isolate the zone from which the ESP had been pumping. The ESP can be run in on coiled tubing or rigid tubing or wireline.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.