Method for integrating controls for captive power generation facilities with controls for metallurgical facilities

US8532834B2 · kind B2 · utility

13Cited by
31References
37Claims
0Family size

Assignee

Inventors

Key dates

Filing dateOct 29, 2010
Grant dateSep 10, 2013
Priority date
Expiry dateSep 16, 2031

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY04S20/222
  • WIPO fieldElectrical machinery, apparatus, energy
  • WIPO sectorElectrical engineering

Abstract

A control system for a combined power generation and metallurgical plant facility integrates generator-side and load-side control to provide coordinated operation of the two processes. The power generation facility includes one or more generator units and the metallurgical plant facility includes one or more controllable loads. Operating characteristics of the one or more loads are fed back to the one or generator units through a master controller to determine input control parameters for the one or more generator units. Similarly control signals and operating characteristics of the one or more generators are fed forward to the one or more loads through the master controller to determine input control parameters for the one or more loads. Using feed-forward as well as feed-back loops to exchange generator output and load set-point information, power balance between the generator units and controlled loads is maintained within an operating envelope.