Patent · US Active

Method for optimizing well production in reservoirs having flow barriers

US8543364B2 · kind B2 · utility

12Cited by
5References
27Claims
0Family size

Assignees

Inventors

Key dates

Filing dateSep 17, 2009
Grant dateSep 24, 2013
Priority date
Expiry dateNov 20, 2031

Classification

  • Technology area (CPC E)Fixed Constructions
  • CPC primaryE21B43/00
  • WIPO fieldCivil engineering
  • WIPO sectorOther fields

Abstract

Computer-implemented systems and methods are provided for optimizing hydrocarbon recovery from subsurface formations, including subsurface formations having bottom water or edgewater. A system and method can be configured to receive data indicative of by-pass oil areas in the subsurface formation from reservoir simulation, identify flow barriers in the subsurface formation based on the by-pass oil areas identified by the reservoir simulation, and predict the lateral extension of the identified flow barriers in the subsurface formation. Infill horizontal wells can be placed at areas of the subsurface formation relative to the flow barriers such that production from a horizontal well in the subsurface formation optimizes hydrocarbon recovery.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.