Patent · US Active

Method for the construction of a civil engineering structure and associated system

US8555599B2 · kind B2 · utility

0Cited by
6References
25Claims
0Family size

Assignee

Inventors

Key dates

Filing dateNov 7, 2008
Grant dateOct 15, 2013
Priority date
Expiry dateNov 22, 2029

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY10T29/49631
  • WIPO fieldEngines, pumps, turbines
  • WIPO sectorMechanical engineering

Abstract

A method of construction of a civil engineering structure that includes first and second superimposed components is described. According to one embodiment of the method: the second component is positioned beneath a fixed lifting structure that includes a lifting device, the second component is lifted using the lifting device, the first component is positioned beneath the fixed lifting structure substantially below the second component, and the second component is substantially placed on the first component using the lifting device, while the second component remains substantially in place.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.