Collaborative environment to assess, design, and implement product changes
US8560358B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Sep 23, 2008 |
| Grant date | Oct 15, 2013 |
| Priority date | — |
| Expiry date | Mar 12, 2031 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06Q10/06311
- WIPO fieldIT methods for management
- WIPO sectorElectrical engineering
Abstract
Generation of an engineering change case is initiated by associating an identified problem for a product with an engineering change case template. The engineering change case can include a plurality of structured folders that can be populated with content characterizing the identified problem as well as proposed solutions to the identified problem with each folder being assignable to one or more users and having associated deliverables for such users. The various users populate the folders with content associated with the deliverables with at least a portion of the deliverables being delegable and requiring completion in a sequential order. Thereafter, generation of the engineering case can be finalized when an indication is received that all deliverables requiring approval have been completed. Otherwise, the engineering change case can be canceled. Related apparatus, systems, techniques and articles are also described.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.