Cycle planning tool with event conflict resolution for territory management
US8560380B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Sep 16, 2011 |
| Grant date | Oct 15, 2013 |
| Priority date | — |
| Expiry date | Sep 16, 2031 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06Q10/1097
- WIPO fieldIT methods for management
- WIPO sectorElectrical engineering
Abstract
Electronically creating a schedule plan of events which replicates one or more previously scheduled events. A source date range is acquired into a memory of a machine. A set of previously scheduled events within the source date range is identified. A target date range is received through a user interface. At least a portion of the previously scheduled events is assigned to a date within the received target date range to create the schedule plan. The schedule plan is posted to a calendar. Another method creates a schedule plan on the basis of one or more search criteria used for identifying any match from a database. At least a portion of any matches are assigned a time slot within a target date range of a calendar program.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.