Enhanced plant level support of grid reconstruction

US8565929B2 · kind B2 · utility

0Cited by
3References
9Claims
0Family size

Assignee

Inventors

Key dates

Filing dateNov 17, 2010
Grant dateOct 22, 2013
Priority date
Expiry dateOct 7, 2031

Classification

  • Technology area (CPC H)Electricity
  • CPC primaryH02J3/466
  • WIPO fieldElectrical machinery, apparatus, energy
  • WIPO sectorElectrical engineering

Abstract

Methodology is provided for enhancing plant level support for grid reconstruction following a blackout. A plant based grid reconstruction manager develops solutions for reconstruction sequence steps to be carried out automatically or to be communicated to site personnel for manual implementation. The sequence steps are based on high-fidelity modeling of the capabilities all of the power production units present in a power plant and take into consideration grid specified load expectations, ambient conditions including ambient temperature and gas turbine operating levels. The methodology also provides for consideration of possible subsequent steps in the sequence to maximize the ability to pick-up additional load in such subsequent steps.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.