Steam turbine power plant and operating method thereof
US8567196B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Aug 24, 2010 |
| Grant date | Oct 29, 2013 |
| Priority date | — |
| Expiry date | Dec 3, 2031 |
Classification
- Technology area (CPC Y)Emerging Cross-Sectional Technologies
- CPC primaryY02E20/32
- WIPO fieldChemical engineering
- WIPO sectorChemistry
Abstract
A steam turbine power plant 10 includes a steam turbine facility 20 in which power is generated by driving steam turbines with steam from a boiler 21 generating steam using combustion heat and steam from a heat collecting steam generator 31 generating steam using sunlight, and a carbon dioxide collecting facility 60 in which carbon dioxide contained in combustion gas from the boiler 21 and the like is collected. Further, steam from the heat collecting steam generator 31 is delivered to a solar heat steam turbine 32 and performs expansion work, and thereafter part of the steam is delivered to the carbon dioxide collecting facility 60 via a pipe 51 and heats the absorbing liquid 100 in the recovery tower 80.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.