Environment based node selection for work scheduling in a parallel computing system
US8589931B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Mar 18, 2009 |
| Grant date | Nov 19, 2013 |
| Priority date | — |
| Expiry date | Dec 12, 2030 |
Classification
- Technology area (CPC Y)Emerging Cross-Sectional Technologies
- CPC primaryY02D10/00
- WIPO fieldComputer technology
- WIPO sectorElectrical engineering
Abstract
A method, apparatus, and program product manage scheduling of a plurality of jobs in a parallel computing system of the type that includes a plurality of computing nodes and is disposed in a data center. The plurality of jobs are scheduled for execution on a group of computing nodes from the plurality of computing nodes based on the physical locations of the plurality of computing nodes in the data center. The group of computing nodes is further selected so as to distribute at least one of a heat load and an energy load within the data center. The plurality of jobs may be additionally scheduled based upon an estimated processing requirement for each job of the plurality of jobs.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.