Patent · US Active

Network aware process scheduling

US8595743B2 · kind B2 · utility

48Cited by
75References
17Claims
0Family size

Assignee

Inventors

Key dates

Filing dateMay 1, 2012
Grant dateNov 26, 2013
Priority date
Expiry dateJun 14, 2032

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06F9/5083
  • WIPO fieldComputer technology
  • WIPO sectorElectrical engineering

Abstract

A schedule graph may be used to identify executable elements that consume data from a network interface or other input/output interface. The schedule graph may be traversed to identify a sequence or pipeline of executable elements that may be triggered from data received on the interface, then a process scheduler may cause those executable elements to be executed on available processors. A queue manager and a load manager may optimize the resources allocated to the executable elements to maximize the throughput for the input/output interface. Such as system may optimize processing for input or output of network connections, storage devices, or other input/output devices.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.