Patent · US Active

Smart building manager

US8600556B2 · kind B2 · utility

282Cited by
104References
85Claims
0Family size

Assignee

Inventors

Key dates

Filing dateJun 21, 2010
Grant dateDec 3, 2013
Priority date
Expiry dateDec 25, 2031

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY04S50/14
  • WIPO fieldElectrical machinery, apparatus, energy
  • WIPO sectorElectrical engineering

Abstract

A building manager includes a communications interface configured to receive information from a smart energy grid. The building manager further includes an integrated control layer configured to receive inputs from and to provide outputs to a plurality of building subsystems. The integrated control layer includes a plurality of control algorithm modules configured to process the inputs and to determine the outputs. The building manager further includes a fault detection and diagnostics layer configured to use statistical analysis on the inputs received from the integrated control layer to detect and diagnose faults. The building manager yet further includes a demand response layer configured to process the information received from the smart energy grid to determine adjustments to the plurality of control algorithms of the integrated control layer.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.