Patent · US Active

Constrained rate monotonic analysis and scheduling

US8621473B2 · kind B2 · utility

7Cited by
21References
19Claims
0Family size

Assignee

Inventors

Key dates

Filing dateAug 1, 2011
Grant dateDec 31, 2013
Priority date
Expiry dateMar 29, 2032

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06F2209/483
  • WIPO fieldComputer technology
  • WIPO sectorElectrical engineering

Abstract

A method for scheduling schedulable entities onto an execution timeline for a processing entity in a constrained environment includes determining available capacity on the execution timeline for the processing entity based on constraints on the execution timeline over a plurality of time periods, wherein schedulable entities can only be scheduled onto the execution timeline during schedulable windows of time that are not precluded by constraints. The method further includes determining whether enough available capacity exists to schedule a schedulable entity with a budget at a rate. The method further includes when enough available capacity exists to schedule the schedulable entity with the budget at the rate, scheduling the schedulable entity onto the execution timeline for the processing entity during a schedulable window of time. The method further includes when the schedulable entity is scheduled onto the execution timeline, updating available capacity to reflect the capacity utilized by the schedulable entity.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.