Automated construction and deployment of complex event processing applications and business activity monitoring dashboards
US8640089B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Jul 25, 2012 |
| Grant date | Jan 28, 2014 |
| Priority date | — |
| Expiry date | Jul 25, 2032 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06Q10/00
- WIPO fieldIT methods for management
- WIPO sectorElectrical engineering
Abstract
A system and method for constructing and deploying a business activity monitoring (BAM) dashboard associated with an event-based process are disclosed. A configuration module receives an event-based process identifier for an event-based process and data, such as inputs or outputs, for the event-based process. A generation module then generates a dashboard description that includes the identifier and an associated dashboard template having one or more dashboard components. This dashboard description is used by a dashboard server to automatically generate a BAM dashboard for monitoring the event-based process by using the association between the dashboard template and the event-based process to display data associated with the event-based process using one or more dashboard components.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.