Order fulfillment logistics workflow
US8644983B1 · kind B1 · utility
Assignee
Inventors
Key dates
| Filing date | Feb 1, 2010 |
| Grant date | Feb 4, 2014 |
| Priority date | — |
| Expiry date | Dec 7, 2032 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06Q10/08
- WIPO fieldIT methods for management
- WIPO sectorElectrical engineering
Abstract
An order fulfillment system is provided. The system comprises logistics substations comprising an entry and exit points. The system also comprises conveyors that adaptively couple the logistics substations in a serialized order fulfillment logistics workflow to convey an order from a selected one of the entry points of one of the logistics substations to a selected plurality of logistics substations where order fulfillment procedures are performed on the order and to a selected one of the exit points of one of the logistics substations. The system also comprises a computer system that receives batches of orders, that analyzes a trend of orders, that analyzes a current inventory, that analyzes a current topology of the serialized fulfillment logistics workflow, and that changes the topology of the serialized fulfillment logistics workflow by commanding the plurality of conveyors to change their coupling of the logistics substations, based on the analysis.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.