Model-driven assignment of work to a software factory
US8660878B2 · kind B2 · utility
13Cited by
74References
17Claims
0Family size
Assignee
Inventors
Key dates
| Filing date | Jun 15, 2011 |
| Grant date | Feb 25, 2014 |
| Priority date | — |
| Expiry date | Jun 15, 2031 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06Q10/0639
- WIPO fieldIT methods for management
- WIPO sectorElectrical engineering
Abstract
A computer implemented method, system, and/or computer program product assigns work to a software factory for implementing a project. A project model of a project is generated. Project model subcomponents are mapped to work packets that are available to a software factory, thus leading to the generation of a work plan for performing the project via an execution of the available work packets.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.