Patent · US Active

Systems and methods of automatically scheduling a workforce

US8666795B2 · kind B2 · utility

4Cited by
4References
14Claims
0Family size

Assignee

Inventors

Key dates

Filing dateNov 19, 2012
Grant dateMar 4, 2014
Priority date
Expiry dateNov 19, 2032

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06Q10/1097
  • WIPO fieldIT methods for management
  • WIPO sectorElectrical engineering

Abstract

Systems and methods of workforce scheduling are disclosed. One example embodiment, among others, comprises a computer-implemented method of scheduling workers. Each worker is associated with one of a set of flexibility classifications, which include non-flex-time and at least one flex-time. The method includes generating a set of shift instances to cover forecasted demand over a planning period, and assigning the shift instances to the set of workers by iterating through the each of the workers to assign at least a portion of the shift instances to a selected one of the workers. The assigning is such that total hours assigned to the selected worker depends on a number associated with the classification of the selected worker.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.