Patent · US Active

Scheduling threads based on an actual power consumption and a predicted new power consumption

US8677361B2 · kind B2 · utility

15Cited by
9References
20Claims
0Family size

Assignee

Inventors

Key dates

Filing dateSep 28, 2011
Grant dateMar 18, 2014
Priority date
Expiry dateSep 28, 2031

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY02D10/00
  • WIPO fieldComputer technology
  • WIPO sectorElectrical engineering

Abstract

Scheduling threads in a multi-threaded/multi-core processor having a given instruction window, and scheduling a predefined number N of threads among a set of M active threads in each context switch interval are provided. The actual power consumption of each running thread during a given context switch interval is determined, and a predefined priority level is associated with each thread among the active threads based on the actual power consumption determined for the threads. The power consumption expected for each active thread during the next context switch interval in the current instruction window (CIW_Power_Th) is predicted, and a set of threads to be scheduled among the active threads are selected from the priority level associated with each active thread and the power consumption predicted for each active thread in the current instruction window.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.