Patent · US Active

Well control operational and training aid

US8678085B1 · kind B1 · utility

0Cited by
8References
8Claims
0Family size

Inventor

Key dates

Filing dateDec 9, 2010
Grant dateMar 25, 2014
Priority date
Expiry dateApr 2, 2032

Classification

  • Technology area (CPC E)Fixed Constructions
  • CPC primaryE21B21/08
  • WIPO fieldCivil engineering
  • WIPO sectorOther fields

Abstract

A method and system to aid and/or train well control personnel by measuring the actual hydraulic delay and pressure attenuation of operator choke changes during well control operations or simulations. This provides the choke operator with an anticipated drillpipe pressure as soon as the choke is adjusted, accounting for hydraulic delay, pressure attenuation and prior choke adjustments that are currently travelling through the wellbore as well as reflections of the transient pressure waves against the pumps and choke. The technique that is described utilizes only three inputs, and works without knowledge of or inputting data such as well depth, pipe and hole geometry, mud properties, temperature, water depth, land, offshore platform or floating (subsea BOP's) drilling rigs.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.