Lead time and validity based supply determination
US8688547B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Dec 22, 2006 |
| Grant date | Apr 1, 2014 |
| Priority date | — |
| Expiry date | Jul 19, 2031 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06Q10/06
- WIPO fieldIT methods for management
- WIPO sectorElectrical engineering
Abstract
A system and method schedule manufacturing of a product by a requested availability date. Sources of supply are selected for a given material to be used for manufacturing the product. A check is then performed for each source of supply to ensure that a valid-to date of the source of supply is equal or later than a plan start date. Lead times for sources of supply are calculated having a valid-to date equal or later than a plan start date. A source of supply is selected as a function of a validity interval of the source and a validity date.