Patent · US Active

Integrated work lists for engineering project change management

US8726226B2 · kind B2 · utility

3Cited by
10References
20Claims
0Family size

Assignee

Inventors

Key dates

Filing dateJun 5, 2009
Grant dateMay 13, 2014
Priority date
Expiry dateDec 30, 2031

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06F8/34
  • WIPO fieldComputer technology
  • WIPO sectorElectrical engineering

Abstract

A tool supports management of engineering project changes using a current design diagram with links to implementation components, a proposed design diagram, and a work list of tasks for transforming the current design into the proposed design. Tasks recite intended changes such as add, remove, or refactor, with reference to implementation components to be changed, and tracking information. Work list tasks may be automatically generated based on design model differences correlated with project code, automatically generated based on tracked user design actions correlated with project code, and/or manually generated by users. Work lists may be exported. Users can mark a relationship for removal and view a corresponding updated work list. Users can trace impact of a work list on project context such as testing coverage, database structures, and user scenarios.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.