Patent · US Active

Power management during grid faults

US8742609B2 · kind B2 · utility

9Cited by
3References
25Claims
0Family size

Assignee

Inventors

Key dates

Filing dateJun 30, 2010
Grant dateJun 3, 2014
Priority date
Expiry dateMar 26, 2032

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY02E70/30
  • WIPO fieldEngines, pumps, turbines
  • WIPO sectorMechanical engineering

Abstract

A method for operating a wind turbine facility during for example a grid fault, the wind turbine facility comprising a power dissipation/storage being adapted to dissipate or store electrical energy exceeding an amount to be delivered to an associated power supply grid during the grid fault. The method includes operating the wind turbine facility in accordance with an allowed amount of electrical energy that can be dissipated or stored in the power dissipation/storage of the wind turbine facility by ensuring that a total amount of electrical energy generated by the wind turbine facility does not exceed a sum of the allowed amount and the amount to be delivered to the power supply grid.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.