Translating service level objectives to system metrics
US8756307B1 · kind B1 · utility
Assignee
Inventors
Key dates
| Filing date | Jul 30, 2007 |
| Grant date | Jun 17, 2014 |
| Priority date | — |
| Expiry date | Jul 30, 2027 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06F11/3447
- WIPO fieldComputer technology
- WIPO sectorElectrical engineering
Abstract
Service level objectives for a multi-tier system are translated to low-level system metrics by determining component profiles. The component profiles include performance parameters calculated as a function of applied resources for each of a plurality of components of the multi-tier system. Performance models including service level parameters are also determined. The performance models are determined as a function of the performance parameters and workload characteristics. The service level objectives are translated to the low-level system metrics using the performance models.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.