Determining estimation variance associated with project planning
US8781869B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | May 30, 2008 |
| Grant date | Jul 15, 2014 |
| Priority date | — |
| Expiry date | Dec 21, 2030 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06Q10/06312
- WIPO fieldIT methods for management
- WIPO sectorElectrical engineering
Abstract
Method and system for determining estimation variance associated with project planning are provided. In one aspect, information associated with a project is obtained and initial estimations for the tasks in the project are determined using available information. The tasks are performed and actual measurements are obtained from the completed tasks. The actual measurements are used to revise the estimates of the remaining tasks. The revised estimates are used to compute a project level estimate and a variance on that estimate, and to enable better project management.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.