Patent · US Active

Cluster computational capacity level switching based on demand prediction and stability constraint and power consumption management

US8788855B2 · kind B2 · utility

78Cited by
4References
20Claims
0Family size

Assignee

Inventors

Key dates

Filing dateSep 23, 2011
Grant dateJul 22, 2014
Priority date
Expiry dateOct 5, 2032

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY02D10/00
  • WIPO fieldComputer technology
  • WIPO sectorElectrical engineering

Abstract

Power consumption and computational availability of a cluster are automatically managed by monitoring consumption, predicting demand based on a job queue and/or historic data, and checking certain conditions and constraints. Threshold conditions for switching the cluster's capacity level are based on the current level and the predicted demand. Switching levels is avoided when a stability constraint would be violated. Cluster capacity levels can be uniformly or nonuniformly spaced, and may have decreasing gaps between levels as capacity decreases. Capacity level definitions and level switching conditions and constraints may be defaults and/or be provided by an administrator.