Foundation system for bridges and other structures
US8789337B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Jul 3, 2012 |
| Grant date | Jul 29, 2014 |
| Priority date | — |
| Expiry date | Jul 29, 2032 |
Classification
- Technology area (CPC E)Fixed Constructions
- CPC primaryE02D29/045
- WIPO fieldCivil engineering
- WIPO sectorOther fields
Abstract
A bridge system is provided that utilizes foundation structures that are formed of the combination of precast and cast-in-place concrete. A method of constructing the combination precast and cast-in-place concrete foundation structures involves receiving at a construction site a precast concrete foundation unit having elongated upright wall members that define a channel therebetween, and multiple upright supports located within the channel; placing the precast concrete foundation unit at a desired use location; delivering concrete into the channel while the precast concrete foundation unit remains at the desired use location; and allowing the concrete to cure-in-place such that the elongated upright wall members are connected to the cured-in-place concrete by reinforcement embedded within both the cured-in-place concrete and the upright wall members. The bridge units may be placed before the pouring step to embed the bottoms of the bridge units in the cast-in-place concrete.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.