Formation evaluation instrument and method
US8794318B2 · kind B2 · utility
17Cited by
20References
13Claims
0Family size
Assignee
Inventors
Key dates
| Filing date | Jul 9, 2009 |
| Grant date | Aug 5, 2014 |
| Priority date | — |
| Expiry date | Sep 9, 2030 |
Classification
- Technology area (CPC E)Fixed Constructions
- CPC primaryE21B49/10
- WIPO fieldCivil engineering
- WIPO sectorOther fields
Abstract
Subsurface formation evaluation comprising, for example, sealing a portion of a wall of a wellbore penetrating the formation, forming a hole through the sealed portion of the wellbore wall, injecting an injection fluid into the formation through the hole, and determining a saturation of the injection fluid in the formation by measuring a property of the formation proximate the hole while maintaining the sealed portion of the wellbore wall.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.