Resource management method and system enabling identity mapping between resources and objects
US8799855B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Mar 14, 2006 |
| Grant date | Aug 5, 2014 |
| Priority date | — |
| Expiry date | Jan 3, 2032 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06Q10/06
- WIPO fieldIT methods for management
- WIPO sectorElectrical engineering
Abstract
A resource management infrastructure (200) is proposed, wherein every resource may be represented by multiple (specialized) objects (B1, C1, D1; C2), which instantiate corresponding (specialized) classes (315) modeling different aspects of the resources. In the proposed solution, an edge class (310) is associated with the specialized classes; each resource is associated with a corresponding edge object (A1; A2) instantiating the edge class (which object is identified by a corresponding edge name). More specifically, the classes are organized into a specialization tree (300); the edge classes directly depend on abstract classes, while the specialized classes in turn depend on the edge classes. Each specialized object is then associated with the edge name of the corresponding edge object. In this way, the specialized objects associated with each edge name represent the same corresponding resource. An optimized structure of a relational database (225, 230) implementing the proposed solution is also proposed.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.