Electric or natural gas fired small footprint fracturing fluid blending and pumping equipment
US8834012B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | May 6, 2010 |
| Grant date | Sep 16, 2014 |
| Priority date | — |
| Expiry date | Jan 3, 2033 |
Classification
- Technology area (CPC E)Fixed Constructions
- CPC primaryE21B43/2607
- WIPO fieldCivil engineering
- WIPO sectorOther fields
Abstract
Methods and systems for integral storage and blending of the materials used in oilfield operations are disclosed. A modular integrated material blending and storage system includes a first module comprising a storage unit, a second module comprising a liquid additive storage unit and a pump for maintaining pressure at an outlet of the liquid additive storage unit. The system further includes a third module comprising a pre-gel blender. An output of each of the first module, the second module and the third module is located above a blender and gravity directs the contents of the first module, the second module and the third module to the blender. The system also includes a pump that directs the output of the blender to a desired down hole location. The pump may be powered by natural gas or electricity.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.