Patent · US Active

Systems and methods for reservoir development and management optimization

US8849623B2 · kind B2 · utility

11Cited by
29References
13Claims
0Family size

Assignee

Inventors

Key dates

Filing dateSep 14, 2009
Grant dateSep 30, 2014
Priority date
Expiry dateMay 31, 2031

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG01V2210/663
  • WIPO fieldMeasurement
  • WIPO sectorInstruments

Abstract

Systems and methods which implement surrogate (e.g., approximation) models to systematically reduce the parameter space in an optimization problem are shown. In certain embodiments, rigorous (e.g., higher fidelity) models are implemented with respect to the reduced parameter space provided by use of surrogate models to efficiently and more rapidly arrive at an optimized solution. Accordingly, certain embodiments build surrogate models of an actual simulation, and systematically reduce the number of design parameters used in the actual simulation to solve optimization problems using the actual simulation. A multi-stage method that facilitates optimization of decisions related to development planning and reservoir management may be provided. Iterative processing may be implemented with respect to a multi-stage optimization method. There may be uncertainty in various parameters, such as in reservoir parameters, which is taken into account according to certain embodiments.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.