Apparatus and method for clock shift correction for measurement-while-drilling measurements
US8902695B2 · kind B2 · utility
7Cited by
20References
20Claims
0Family size
Assignee
Inventors
Key dates
| Filing date | Dec 3, 2007 |
| Grant date | Dec 2, 2014 |
| Priority date | — |
| Expiry date | Jan 18, 2031 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG01V2200/12
- WIPO fieldMeasurement
- WIPO sectorInstruments
Abstract
The disclosure provides a method which includes transmitting signals over a time period between a downhole location and a surface location during drilling of a wellbore; recording the time of each signal at the surface using a surface clock and the time of each signal downhole using a downhole clock; and correcting the downhole measurements using the recorded times.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.