Patent · US Active

Synchronous local and cross-site failover in clustered storage systems

US8904231B2 · kind B2 · utility

345Cited by
6References
30Claims
0Family size

Assignee

Inventors

Key dates

Filing dateAug 8, 2012
Grant dateDec 2, 2014
Priority date
Expiry dateJun 18, 2033

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06F2212/286
  • WIPO fieldComputer technology
  • WIPO sectorElectrical engineering

Abstract

Synchronous local and cross-site switchover and switchback operations of a node in a disaster recovery (DR) group are described. In one embodiment, during switchover, a takeover node receives a failover request and responsively identifies a first partner node in a first cluster and a second partner node in a second cluster. The first partner node and the takeover node form a first high-availability (HA) group and the second partner node and a third partner node in the second cluster form a second HA group. The first and second HA groups form the DR group and share a storage fabric. The takeover node synchronously restores client access requests associated with a failed partner node at the takeover node.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.