Combined synchronous and asynchronous tag deployment
US8904278B1 · kind B1 · utility
Assignee
Inventors
Key dates
| Filing date | Jan 9, 2014 |
| Grant date | Dec 2, 2014 |
| Priority date | — |
| Expiry date | Jan 9, 2034 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06Q30/0201
- WIPO fieldComputer technology
- WIPO sectorElectrical engineering
Abstract
A tag management system can implement a combined synchronous and asynchronous tag-loading scheme. In an embodiment of this scheme, a synchronous tag may be included at the top of or near the top of a content page. This synchronous tag can hide one or more page elements that are to be modified by a subsequent asynchronous personalization tag. Subsequently, the asynchronous personalization tag can update the page element and then cause the page element to be displayed. As a result, flicker between the old and new page elements can be reduced or avoided.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.