Track link with replaceable rail and method of replacing worn rails on track links
US8905493B2 · kind B2 · utility
Assignee
Inventor
Key dates
| Filing date | May 11, 2011 |
| Grant date | Dec 9, 2014 |
| Priority date | — |
| Expiry date | Nov 21, 2031 |
Classification
- Technology area (CPC B)Performing Operations; Transporting
- CPC primaryB62D55/21
- WIPO fieldTransport
- WIPO sectorMechanical engineering
Abstract
A composite track link is provided that has a body and a replaceable rail brazed or soldered together to provide a metallurgical bond between the track link body and the rail such that the rail may be removed and replaced by heating the track link or the brazing or soldering filler metal when the rail becomes worn. This process enables the rail to be separated from the body of the track link so a new rail can be brazed or soldered to the body of the track link. As a result, track links or bodies of track links may outlast the rails by multiple use cycles. Further, the body and rail may be formed of different materials.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.