Method for primary control of a steam turbine installation
US8955321B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | May 17, 2010 |
| Grant date | Feb 17, 2015 |
| Priority date | — |
| Expiry date | Sep 7, 2031 |
Classification
- Technology area (CPC F)Mechanical Engineering; Lighting; Heating
- CPC primaryF01K13/02
- WIPO fieldEngines, pumps, turbines
- WIPO sectorMechanical engineering
Abstract
A method is provided for primary control of a steam turbine installation in network operation, which provides at least two pressure stages, these being a high-pressure and a low-pressure steam turbine stage, in which for storing reserve power a live steam valve along an operating-steam feed line to at least one pressure stage of the steam turbine is operated in a throttled manner, the live steam valve, in the case of a reducing network frequency and network frequency boosting which is necessary as a result of this, is transferred to an at least less throttled state. At least some of the partially expanded operating steam which issues from the high-pressure steam turbine stage is introduced directly without reheating, into the low-pressure steam turbine stage for further expansion.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.