Patent · US Active

Management of macro network KPI impacts for a mass deployment of femtocells

US8958790B2 · kind B2 · utility

3Cited by
1References
20Claims
0Family size

Assignee

Inventor

Key dates

Filing dateApr 21, 2011
Grant dateFeb 17, 2015
Priority date
Expiry dateSep 19, 2031

Classification

  • Technology area (CPC H)Electricity
  • CPC primaryH04W52/343
  • WIPO fieldDigital communication
  • WIPO sectorElectrical engineering

Abstract

Power management is provided in a femtocell basestation in a cellular communications network, in order to ensure that the effect of a mass deployment of femtocells on the key performance indicators of the surrounding macro network is bounded, for all femtocell traffic profiles. An expected area density of femtocells is determined; a macro layer quality criterion is set; a network performance indicator impact level is set; a maximum impact area allowed for the femtocell is calculated, based on the expected area density of femtocells, the macro layer quality criterion, and the network performance indicator impact level; a distance of a macro layer user from the femtocell is estimated; and the downlink power in the femtocell is controlled, based on the estimated distance of the macro layer user from the femtocell and based on the calculated maximum impact area.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.