Dependency management in task scheduling
US8959527B2 · kind B2 · utility
1Cited by
5References
5Claims
0Family size
Assignee
Inventors
Key dates
| Filing date | Nov 5, 2013 |
| Grant date | Feb 17, 2015 |
| Priority date | — |
| Expiry date | Nov 5, 2033 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06F9/46
- WIPO fieldComputer technology
- WIPO sectorElectrical engineering
Abstract
A task is marked as dependent upon a preceding task. The task that is attempted to be taken for execution from a head of a pending task queue that is marked is deferred. The deferred task is removed from the pending task queue and placed in a deferred task queue. The deferred task is reinserted back into the pending task queue for execution upon determining that the preceding tasks are completed.