Patent · US Active

Methods and structure for task management in storage controllers of a clustered storage system

US8984222B2 · kind B2 · utility

0Cited by
20References
20Claims
0Family size

Assignee

Inventors

Key dates

Filing dateMar 28, 2012
Grant dateMar 17, 2015
Priority date
Expiry dateSep 20, 2032

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY02D10/00
  • WIPO fieldComputer technology
  • WIPO sectorElectrical engineering

Abstract

Methods and structure for task management in storage controllers of a clustered storage system. An initiator storage controller of the clustered storage system ships I/O requests for processing to a target storage controller of the system. Responsive to a need to abort a previously shipped I/O request, the initiator storage controller transmits a task management message to the target storage controller. The task management message identifies one or more previously shipped I/O requests to be aborted. The target storage controller processes the received task management message in due course of processing requests and completes processing for the aborted previously shipped request in an orderly manner. Resources associated with the aborted previously shipped requests are release within both controllers.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.