Patent · US Active

Delayed based traffic rate control in networks with central controllers

US8989010B2 · kind B2 · utility

11Cited by
1References
14Claims
0Family size

Assignee

Inventors

Key dates

Filing dateNov 15, 2012
Grant dateMar 24, 2015
Priority date
Expiry dateJul 17, 2033

Classification

  • Technology area (CPC H)Electricity
  • CPC primaryH04L43/0852
  • WIPO fieldDigital communication
  • WIPO sectorElectrical engineering

Abstract

A process is performed by a controller in a split-architecture network. The controller monitors congestion of traffic groups across the split-architecture network and executes the process to provide delay based data rate control to alleviate congestion of the traffic groups. The process includes configuring an ingress switch and egress switch for each traffic group to collect delay measurement data for data packets of each traffic group as they arrive at the ingress switch and egress switch. The delay measurement data is received from the ingress switch and egress switch of each traffic group. A check is made whether a minimum data packet delay for any traffic group exceeds a defined threshold value. A throttling rate is calculated for each traffic group in the split-architecture network, in response to the defined threshold value being exceeded.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.