Patent · US Active

System and method for project management and completion

US9002721B2 · kind B2 · utility

6Cited by
29References
15Claims
0Family size

Assignee

Inventor

Key dates

Filing dateOct 7, 2009
Grant dateApr 7, 2015
Priority date
Expiry dateMar 3, 2032

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06Q10/103
  • WIPO fieldIT methods for management
  • WIPO sectorElectrical engineering

Abstract

In general, in one aspect, a system for planning and executing projects, facilitates creating a project model comprising tasks and dependencies, determining the complexity of the tasks, and modifying the tasks to maintain complexity within predetermined bounds. The system can facilitate designating one or more tasks to be redundant tasks, and undertaking the redundant tasks with redundant resources. In some embodiments, the system includes a module for evaluating task criticality and designating redundant tasks based on the task complexity and criticality.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.