Patent · US Active

Mobile oil sands mining system

US9016799B2 · kind B2 · utility

2Cited by
128References
25Claims
0Family size

Assignee

Inventors

Key dates

Filing dateSep 12, 2011
Grant dateApr 28, 2015
Priority date
Expiry dateOct 19, 2031

Classification

  • Technology area (CPC E)Fixed Constructions
  • CPC primaryE21C41/31
  • WIPO fieldCivil engineering
  • WIPO sectorOther fields

Abstract

A method of increasing a dwell time of a slurry facility at a given ore processing location by using a mobile oil sands mining system. The method involves coordinating the operation of at least two mining conveyors to facilitate mining at least one arc-shaped sector of ore that otherwise would not be within operational reach of the slurry facility at the ore processing location. The method increases the slurry facility's operational time at the ore processing location before relocation thereof is required to keep the slurry facility within operational reach of at least one receding mine face.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.